Beechworth Primary
School circa 1865. Sustainabylt managed this project
while the heritage listed school was in operation and some
of the tasks involved are listed below
#Replacement
of much of the sub floor and floor boards due to termite
damage
#Installation
of a reticulated termite treatment system
#Removal and
replacement of skirting boards damaged due to termite activity
#Removal of kitchens
and assorted benches to restore the building to its original
state
#Removal of large
sections of solid plaster, including bull nosed arches,
injection of the wall to prevent rising damp and repair
of the wall.
#Roof works associated
with leaking slate tiles
#Removal of asbestos
from toilet blocks and installation of removable checker
plate access panels
#Carpet removal
and laying including cabling and electrical works.
#installation
of emergency shower facilities.